

Media Exposure (Southern Cross News)
One of our design team member has been interviewed by Southern Cross News to talk about our concept for this Portal. It was broadcasted...


Media Launch Day
It is our official media launch day today. We are so excited to introduce our design to everyone else through various medias. Last but...


Portal Production 10
Finally, we have finished our last petal for the Portal design and ready for Media Launch tomorrow. This timelapse is dedicated to all...


Portal Production 09
It is another busy day for us spending the whole afternoon assembling the Portal in the school workshop. Robin, the school workshop...


Scaled Model
A scaled model has been made simultaneously along with the Portal, it is an illustration to showcase the shape of the actual portal as...


Portal Production 08
It is another busy day for us in the school workshop working our ways out on installing the final pieces of the Tasmanian Craft Fair...


Portal Production 07
Yay!!! Our second petal of the Portal design is finally up now. Looking forward to finish the whole installation really soon!!!...


Portal Transportation
A local logistics company, Suncoast Express is willing to help us out at the lowest rate on transporting the Portal from our Launceston...


Portal Production 06
Here is a progress video showing what our design team members have been doing for the entire portal assembly.


Portal Production 05
The design team members have mastered the skill of "SANDING" the plywood strips for assembly. It is no easy job as the preparations are...