Portal Production 09
- Utas Design Team
- Oct 23, 2016
- 1 min read
It is another busy day for us spending the whole afternoon assembling the Portal in the school workshop. Robin, the school workshop manager has kindly allowed us to access the workshop during the weekend and sacrificed his own time to be around in case we need any help from him.
We intended to finish installing the whole structure of the Portal by today though we have encountered numerous issues in the past.

Team Members Fixing 6mm Plywood Strips Onto 12mm Plywood Ribs

One Team Member Fixing Bolts At The Joinery

Using Screw Drivers To Enhance the Joining Plywoods

Team Members Putting 4mm Strips In Between 6mm Strips and 12mm Ribs

Team Members Working Together To Assemble The 6mm Strips

One of Team Members Measuring Dimensions For Footing Fixinings

Team Members Working Together Assembling A Single Rib