Physical Model Progress 08
- Utas Design Team
- Sep 30, 2016
- 1 min read
Apart from the main structure for the Portal design, we will have to think about the joining systems of its individual elements. It is very critical of how the individually designed units are fixed together to form as a whole structure, not only in structural wise it works, but also in its architectural aesthetic ways of presenting it.
The "footing" system is fairly important as well because it plays the role of catering most of the loads of the structure itself. The choice of materials selected for the "footing" is supposed to be easily constructed or economically manufactured.

Mark Briefing The Design Team On Footing System

Location of Bolts Towards The End of Individual Elements

Design Team Member Sanding The "Footing Panel"

The Design Team Trying To Join The Structure To The "Footing Panel"

The Design Team Trying To Assemble The Structure

Clamping The Joints

The Design Team Having A Discussion With The Structural Engineer