top of page
  • 2
  • Black YouTube Icon
  • Black Pinterest Icon
  • Black Instagram Icon
Recent Posts
Featured Posts

Portal Production 01

  • Utas Design Team
  • Oct 6, 2016
  • 1 min read

We have come to the phase where final production needs to be taken place and all sorts of decisions have to be finalised as well, such as material ordering, footing system etc.

Below images showing the process of preparing and assembling the very first main structure, Petal out of 4 of them in total.

Two Team Members "Lacquering" The Cut-Plywood Strips

Team Members "Sanding" The Plywood Strips

Two Team Members "Sanding" The Strips Using Electric Sanders

One of Team Members Sanding The Strips In Progress

One Team Members Drilling Holes On the Plywood For Fixings

One Team Member Measuring The Accurate Position For The Fixing Panels

Team Members Working Together Joining The Structure

 
 
 

Comments


Follow Us
Search By Tags
Archive
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© Copyright 2016 Tasmanian Craft Fair Portal Design Team / School of Architecture & Design, University of Tasmania

bottom of page